Renovated kitchen in a Murray Hill co-op residence in Manhattan

Manhattan Kitchen & Bath · Murray Hill

Kitchen, Bathroom & Home Remodeling in Murray Hill

4.9 homeowner rating · 250+ projects completed

One design-build team for every project on this page — our kitchen, bathroom, home, commercial, and restoration services, tailored to Murray Hill homes and buildings.

✓ Fully Insured✓ Free Written Estimates✓ Permits & Board Approvals Handled✓ 24/7 Damage Restoration

The Neighborhood

Remodeling in Murray Hill

Murray Hill rewards remodeling that respects its residential calm — prewar co-ops with proper entry galleries, side-street townhouses, and doorman buildings that have housed generations of East Siders. Manhattan Kitchen & Bath plans every Murray Hill project around the particular property rather than a standard package. Choose any service below to see how we approach it locally, from initial scope and materials through board approvals and final detailing.

The logistics deserve as much attention as the design. Board alteration packages, service-elevator reservations, historic-district designations, and prewar plumbing are routine here, and each building sets its own work-hour and protection rules. We manage that paperwork and sequencing as part of the engagement and confirm final requirements after a site visit and a review of your building's procedures.

Whether the project is a complete kitchen in a Park Avenue co-op, a walk-in shower conversion in a prewar bath, a full apartment update, a townhouse renovation on a side street, or water damage that needs fast, documented repair, the starting point is the same: careful field measurements, a candid conversation about scope and budget, and a written, line-item quote. Start with the service you need below, or request a free estimate and we will help you decide where to begin.

Most Requested

Popular Services in Murray Hill

The projects Murray Hill homeowners, boards, and building managers call us about most — tap any one to open its full local service page.

Before You Start

Renovating in Murray Hill: Local Considerations

Murray Hill is the East Side's quiet residential pocket between the Midtown towers — prewar co-ops and doorman buildings along Park, Lexington, and Third Avenues, brownstones and townhouses on the side streets of the East 30s, and the curry houses of Lexington Avenue's Curry Hill below it. The Morgan Library anchors the neighborhood's landmarked core, and the Murray Hill Historic District protects a stretch of those side-street townhouses and low-rise buildings. Day to day, interior renovations here are governed by co-op boards and managing agents with detailed alteration agreements.

A typical Murray Hill project starts with the board package: a signed alteration agreement, drawings, contractor insurance and license documentation, and a proposed schedule, reviewed before a single delivery is booked. Behind the walls, prewar buildings bring cast-iron stacks, original risers that should not move casually, and thick plaster that changes how tile and cabinetry are set. Townhouse work follows a different path — fewer neighbors above and below, but Landmarks review for anything visible from the street inside the historic district. We document those conditions up front, reserve the service elevator where the building has one, and sequence the job around the building's work hours and protection rules.

  • Board & management packages — Alteration agreements, drawings, insurance, and license documentation prepared and submitted for you
  • Historic district awareness — Murray Hill Historic District requirements for townhouse exteriors identified before they affect the schedule
  • NYC DOB permits — Filed for plumbing, electrical, and layout changes, with inspections scheduled
  • Building logistics — Service-elevator reservations, work-hour rules, and protected lobbies and corridors
  • Prewar conditions — Cast-iron stacks, original risers, and plaster construction assessed before demolition — not during

Where We Work

Landmarks & Neighborhoods We Serve in Murray Hill

Our crews work across Murray Hill every week — prewar co-ops off Park Avenue, townhouses on the East 30s side streets, and doorman buildings along the avenues. If your project sits in or near these parts of the neighborhood, it is already on our route:

The Morgan Library & MuseumSniffen CourtChrysler BuildingGrand Central TerminalEmpire State BuildingTudor CityThe United NationsScandinavia HouseSt. Vartan CathedralCUNY Graduate CenterCurry HillThe Murray Hill Historic District

Questions, Answered

Murray Hill Remodeling FAQs

Do I need my co-op board's approval before renovating?

In most Murray Hill co-ops and many condominiums, yes. Boards here typically require a signed alteration agreement, drawings, contractor insurance and license documentation, and a work schedule before anything starts. We prepare and submit the full package and coordinate with your managing agent, so the approval process doesn't become your second job.

Does the Landmarks Preservation Commission get involved in interior work?

Interior renovations inside the Murray Hill Historic District usually proceed without Landmarks review, because designation protects exteriors and publicly visible features. Where a townhouse project touches windows, facades, or stoops, Landmarks rules can apply — we flag those scopes early and coordinate whatever filings the work requires.

How long does a typical Murray Hill kitchen or bathroom remodel take?

Once board approval is in and materials are on site, most bathrooms run about 3–5 weeks and most kitchens about 6–10 weeks. We map approvals, procurement, and construction into one written schedule before you sign anything, so the timeline you agree to is the one we work to.

Can you work within strict building hours and elevator rules?

We plan for it on every Murray Hill job. Service-elevator bookings, permitted work hours, delivery windows, and protection for lobbies and corridors are scheduled in advance, and neighbors receive the notice your building requires. The construction sequence is built around those rules, not in spite of them.

What should I expect behind the walls of a prewar Murray Hill apartment?

Cast-iron plumbing stacks, risers that have served the line for decades, and plaster or masonry walls. None of it prevents a good renovation — but wet walls, rough-ins, and tile assemblies are planned around those conditions, and we verify them before final selections depend on them, so surprises surface on paper, not mid-demolition.

Is the estimate really free?

Yes. We visit your home, measure the space, talk through options and materials, and leave you a written, line-item quote at no cost and with no obligation to proceed. Most quotes are back to you within 24–48 hours of the visit.

Free
Get a free estimate in Murray HillWe measure the space, talk through options and materials, and leave you a written, line-item quote — no cost and no obligation to proceed. Questions first? Email manhattankb212@gmail.com.
Request My Free Estimate →
📞 Call (914) 555-0147